××省人民大會(huì)堂遷建工程施工組織設(shè)計(jì).doc
1.1 工程位置
××省人民大會(huì)堂遷建工程位于××市寶石山下,省行政中心規(guī)劃
區(qū)內(nèi)。東為××河,河?xùn)|為環(huán)城西路,道路紅線寬40m;西靠省電力設(shè)計(jì)院辦公樓;南臨市中級(jí)法院和規(guī)劃中的鳳起路延伸段,道路紅線寬24m,路南為××市青海年活動(dòng)中心;北倚省老年活動(dòng)中心和新省府路,道路紅線寬30m,路北為省府大院。地勢(shì)平坦,地面標(biāo)高為黃海高程5.66~5.99m,總用地面積5.9hm2,建筑紅線內(nèi)面積4.91hm2。
1.2 工程特點(diǎn)
經(jīng)過(guò)認(rèn)真學(xué)習(xí),分析研究招標(biāo)文件及設(shè)計(jì)圖紙,我們認(rèn)為本工程具
有以下幾大特點(diǎn):
1.2.1 社會(huì)影響大。本工程作為省重大工程,建筑占地面積達(dá)1.58萬(wàn)余m2,主樓建筑面積達(dá)5.85 萬(wàn)余m2,是省21 世紀(jì)的標(biāo)志性工程,人民和社會(huì)各界時(shí)刻關(guān)心著工程的進(jìn)展和質(zhì)量狀況。
1.2.2 定位標(biāo)準(zhǔn)高。基于本工程的重要性,工程質(zhì)量目標(biāo)必須定位在高起
點(diǎn)上,必須創(chuàng)精品工程。同樣,施工過(guò)程中的安全生產(chǎn)和文明施工也必
須達(dá)到一流水平。
1.2.3 施工進(jìn)度緊。在不到一年半的時(shí)間內(nèi)要完成如此大規(guī)模的工程建
設(shè),除投入充足的機(jī)械、材料、勞動(dòng)力這三大硬件外,需要充分利用工
程單體多的特點(diǎn),合理而周密地進(jìn)行施工部署,同時(shí)提高施工中的科技
含量。
1.2.4 專(zhuān)業(yè)分包單位多。除貫穿于施工全過(guò)程的水、電、風(fēng)、消防等安裝工種外,還涉及鋼結(jié)構(gòu)、玻璃幕墻和鋁板、各弱電系統(tǒng)、以及有關(guān)裝飾
1.1 Project Location
× × Province Great Hall of the relocation project is located in Stone Yamashita × × city, the provincial administrative center planning
Area. × × east river east of the river for the Ring Road, the road red wide 40m; west Provincial Power Design Institute office; south City Intermediate Court and the planned extension of Fengqi road, red road width 24m, Road south × × City in Qinghai was in center; north is the provincial center and new Shěng Fǔ old road red line width of 30m, the road north is the provincial government compound. Flat, ground-level elevation for the Yellow Sea, 5.66 ~ 5.99m, total land area 5.9hm2, building the red line area 4.91hm2.
1.2 The characteristics of the project
After careful study, analysis of tender documents and design drawings, we believe that with this project
Has the following features:
1.2.1 social influence. This works as a provincial key projects, building covers an area of 158 thousand m2, the main building construction area of 585 thousand m2, is the province of the 21st century landmark projects, the people and the community always concerned about the project progress and quality status.
1.2.2 Positioning a high standard. The importance of this project based on the project to be located in the high quality goals from
Point, to create quality works. Similarly, the construction process of the safety production of construction will also
Required to achieve first-class level.
1.2.3 tight construction schedule. Less than a year a half to complete the construction project of this magnitude
Set, in addition to input adequate machinery, materials, labor three major hardware, need to take full advantage of work
Single multi-way characteristics, reasonable and well-deployed to carry out the construction, while improving construction technology
Content.
1.2.4 professional subcontractors and more. In addition throughout the whole process of construction of water, electricity, wind, fire protection installation jobs, but also related to structure, glass walls and aluminum, the weak current system, as well as decorative
幫助中心 收藏 >>> |
本類(lèi)欄目導(dǎo)航
總點(diǎn)擊排行
- 天正建筑2013最新64位破解版
- 173549次
- Autocad2013 64位32位破解版附帶注冊(cè)機(jī)
- 154872次
- 天正建筑8.5破解版
- 146385次
- autocad2012 64位32位 破解版(附注冊(cè)
- 139021次
- 天正建筑8.2破解版
- 127265次
- autocad2010免費(fèi)下載(簡(jiǎn)體中文版)
- 98144次
- 免費(fèi)農(nóng)村房屋設(shè)計(jì)圖
- 90905次
- CAD2008注冊(cè)機(jī)及使用說(shuō)明
- 84340次
- 11g101圖集全套下載
- 78882次
- cad圖集大全
- 67445次
- 建筑工程施工組織設(shè)計(jì)范本
- 5300次
- ***高層施工組織設(shè)計(jì)
- 1831次
- 免費(fèi)高層建筑施工組織設(shè)計(jì)
- 1790次
- 小高層施工組織設(shè)計(jì)
- 1473次
- 新校區(qū)綜合樓工程施工組織設(shè)計(jì)
- 1458次
- 住宅樓工程施工組織設(shè)計(jì)
- 1344次
- 一類(lèi)高層建筑施工組織設(shè)計(jì)
- 1335次
- 科嘉花園小區(qū)6、8、14、16、17#樓施工
- 1291次
- 施工組織設(shè)計(jì)方案
- 972次
- 免費(fèi)超高層建筑施工組織設(shè)計(jì)方案實(shí)例
- 962次
圖文推薦
- 中國(guó)農(nóng)業(yè)發(fā)展銀行xx縣支行住宅樓工程施工組織設(shè)計(jì)
- 北京舞蹈學(xué)院施工組織設(shè)計(jì)和冬期施工方案(最終版)
- 施工組織設(shè)計(jì)編制要點(diǎn)分析及項(xiàng)目管理實(shí)施規(guī)劃編制內(nèi)容探討(王劍
- 哈爾濱國(guó)際會(huì)展體育中心2號(hào)工程施工組織設(shè)計(jì)
- 上海鐵路南站工程施工組織設(shè)計(jì)
- 撫順師范高等專(zhuān)科學(xué)校第五教學(xué)樓施工組織設(shè)計(jì)(方案)
- 中國(guó)銀行廣州信息中心工程施工組織設(shè)計(jì)
- 晉江商務(wù)區(qū)企業(yè)運(yùn)營(yíng)中心 MOCO寶業(yè)大廈施工組織設(shè)計(jì)